Search
`
November 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
CPUC OKs Largest Rollout of Covered Conductor
Modern Insulated Lines More Effective than Traditional Tree Wire, Proponents say
The California PUC approved Southern California Edison to install 600 miles of covered conductor to prevent its higher-voltage lines from starting wildfires.
CaliforniaCalifornia Public Utilities Commission (CPUC)Transmission Operations