Search
March 29, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
SPP Study: $88B to $263B in Generation Needed by 2050
Brattle Group Says All Resources Contribute to Grid Reliability
SPP's future energy and resource needs study could require 250% more capacity than the RTO has today.
SPP's future energy and resource needs study could require 250% more capacity than the RTO has today. | SPP
|
A study of SPP’s future energy and resource needs has found the grid operator will have to rely on thermal generation to maintain grid reliability into midcentury, but it will come at a cost.
Please enter your email address (business domain required) for access.
Resource AdequacySPP