FERC ok'd cost allocations for 60 transmission projects added to PJM’s RTEP, including high-voltage projects allocated entirely to a Dominion Energy zone.
FERC granted FirstEnergy Services’ request to recover “prudently incurred abandonment costs” from Transource Energy’s Independence Energy Connection.
PJM is nearing the finish line in determining how it handles the primary frequency response requirements put in place by FERC Order 842.
The National Energy Technology Laboratory accused PJM of providing misleading analysis of its resource availability during last winter’s “bomb cyclone.”
Public Citizen is urging the Commodity Futures Trading Commission to start overseeing PJM’s embattled financial transmission rights market.
The Department of Energy convened to gather information for the department’s 2019 electric transmission congestion study.
PJM’s highly anticipated re-evaluation of its largest-ever congestion-reducing transmission project shows the benefits to the region exceed its costs.
The PJM Monitor remains unconvinced that performance metrics during localized load sheds should be used to calculate capacity market default offer caps.
PJM is planning a special session of the Planning Committee to further discuss the RTO’s effective load carrying capability analysis for wind and solar.
The Operating Committee endorsed PJM’s recommended winter weekly reserve targets, which consist of monthly values based on weekly peak load.